Concrete Products

OCT 2018

Concrete Products covers the issues that attract producers of ready mixed and manufactured concrete focusing on equipment and material technology, market development and management topics.

Issue link: https://concrete.epubxp.com/i/1037279

Contents of this Issue

Navigation

Page 31 of 60

www.concreteproducts.com October 2018 • 29 Remaining Governor Mario M. Cuomo Bridge work centers on the westbound structure's pedestrian and cyclist path, plus demolition of the original Tappan Zee Bridge. The Tappan Zee Constructors joint venture behind the $4 billion project is comprised of Fluor Corp. (lead), American Bridge Co., Granite Construction Northeast and Taylor Bros. Extensive precast specifications for the deck and other horizontal conditions, were critical to TZC maintaining schedule targets. NEWS SCOPE PRECAST SILOS AND SO MUCH MORE Here's how the engineers and project managers at Imperial Industries helped Wausau Tile create a state-of-the-art 100,000-square-foot concrete paver manufacturing facility: • Integrated system includes 16 Imperial carbon steel silos that range from 29 to 37 feet tall, providing 5 million pounds of material storage • Also includes two large "grizzly" dump hoppers and a dozen additional "day bins" for Wausau Tile's custom- color mixing system • All pieces were designed, manufactured, painted and inspected at Imperial's newly expanded manufacturing facility • Imperial also manufactured all stairs and handrails included in the facility 800-558-2945 | IMPERIALIND.COM FAMILY OWNED AND OPERATED FOR MORE THAN 35 YEARS

Articles in this issue

Links on this page

Archives of this issue

view archives of Concrete Products - OCT 2018