Concrete Products

JUL 2015

Concrete Products covers the issues that attract producers of ready mixed and manufactured concrete focusing on equipment and material technology, market development and management topics.

Issue link: http://concrete.epubxp.com/i/538423

Contents of this Issue

Navigation

Page 29 of 103

28 • July 2015 www.concreteproducts.com In early May, Rhode Island Governor Gina M. Raimondo, Sen- ate President M. Teresa Paiva Weed and Director of the State Department of Environmental Management Janet Coit offi- cially opened a new 240-ft. long, 20-ft. wide concrete pier at Fort Adams State Park in Newport, R.I. Construction on the North Pier began in April 2014 to improve public access to Narragansett Bay. Designed by Lou- is Berger Architects and St. Jean Engineering, both of Prov- idence, R.I., the pier features seven rows of floating docks and a public pump out station. Wilmington, Mass.-based Shea Concrete Products manufactured 15 precast pile caps for the pier, measuring 3-ft., 9-in. wide x 3-ft., 7-in. high x 24-ft. long. The 18-ton caps were made from a Class F fly ash-dosed, 5,000 psi mix, whose self-consolidating prop- erties suited heavy concentration of mostly #9 rebar. Shea Concrete Products Manager Gregory Stratis says the galva- nized rebar was part of the spec the company received and was fabricated and supplied by HarMac Rebar & Steel Corp., a division of A.H. Harris. "The precast saved quite a bit of time," notes Larry Ahearn of Middletown, R.I.-based Reagan Construction, who was the project contractor. "We set the precast on the bear- ing piles which were cut to the exact elevation. The cast-in- place forms were hung from the precast using a custom-built support beam." The catalyst for construction of the pier, the Volvo Ocean Race Newport Stopover took place May 5-17 days after dedi- cation. Approximately 125,000 visitors attended the 12-day celebration that kicked off the seventh leg of the race—the 3,222-mile trip from Newport to Lisbon. The successful event supported Governor Raimondo's view of the benefits of the pier. "Increasing public access to Narragansett Bay is a great way to attract visitors to one of our beautiful state parks," she said at the official opening of the pier. "Completing this type of project demonstrates Rhode Island is ready to welcome residents and tourists alike to enjoy all our state has to offer." Coit added, "Expanding the park's ability to welcome more boats of varying sizes is important as we work to attract even more visitors and water-related events. This strategic investment will help promote Fort Adams as an accessible and welcoming destination for years to come." IMAGES: shea ia + ib + iia IMAGES: shea iiia + b (optional) NEWS SCOPE PRECAST Newport pier supported with Shea Concrete pile caps The precast pile caps, reinforced with galvanized rebar, were set in place and concrete was poured on site to connect the pile caps to- gether. Afterwards, the wood deck was built between the pile caps.

Articles in this issue

Links on this page

Archives of this issue

view archives of Concrete Products - JUL 2015